Key takeaways
- Clear counters, empty the sink cabinet and open a path from the door.
- Confirm that the plumber, backsplash installer and appliance crews are scheduled in order.
- Keep pets and children away from the work area.
- Plan to be available for a walk-through when the crew finishes.
Clear the space
Remove everything from the counters and from the cabinet under the sink. Clear the floor along the path from the door to the kitchen and move fragile items out of the way. If you have an elevator or parking rules, arrange them in advance.
Protect valuables and artwork near the path.
Confirm the other trades
The sink and faucet may need to be reconnected by a plumber, and a backsplash installer often comes after the tops. Appliances such as a cooktop or slide-in range may need to be installed after. Agree on the order so nothing waits.
Tell us who is coming and when.
Pets, children and noise
Stone is heavy and install day involves tools and carrying. Keep children and pets in a separate part of the house for safety. Cutting may be needed on site for minor fits, which can be loud and dusty.
Plan for noise and a bit of dust.
The walk-through
When the crew finishes, walk the work with them: check seams, edges and cutouts, ask about care and confirm any follow-up such as sealing or caulk curing. Keep the care notes and the contact details of the company.
Tell us right away about anything that looks wrong.
Official sources and further reading
These are independent organizations. Links open in a new tab.
Quick answers
Do I need to remove the old top first?
Not necessarily. Removal can be part of the job. Tell us in advance so we plan the time.
How long should I plan to be home?
Plan for most of the install window and the final walk-through.




